
Sanus Aqua
Kerecsend
Maximum yield: 420,000 m³/year
Project area size: ~6 hectares
Buildability: 50%
Learn more
Vital Spring
Újléta
Maximum yield: 210,000 m³/year
Project area size: ~7 hectares
Buildability: 40%
Learn more
Vitafitt Water
Szeremle
Total maximum water yield: 290,000 m³/year
Project area size: ~3 hectares
Buildability: 50%
Learn more
Zalaqua
Zalaszentgrót
Total maximum water yield: 335,500 m³/year
Project area size: ~11 hectares
Buildability: 40%
Learn more
Key Water
Kulcs
Maximum yield: 473,000 m³/year
Project area size: ~4 hectares
Buildability: 50%
Learn moreThe selection of these areas was preceded by comprehensive hydrogeological studies, identifying potential mineral water extraction sites where water quality, hydrogeological conditions, legal possibilities, and economic and logistical factors ideally converge.
What benefits do the wells offer?
- The wells were established following rigorous geological and hydrogeological research and targeted real estate development activities.
- Their construction utilized modern, strictly controlled, and certified materials, adhering to professional requirements (ISO 9001:2009).
- Specifically developed technological materials for mineral and drinking water production (filters, pipelines) were installed.
- The mineral water originates from a protected aquifer, delineated by a hydrogeological protective radius. Within this radius, no other wells can be drilled, and no mining activities are allowed, ensuring the water source is protected both in quantity and quality.
- The extracted mineral water’s consistent quality is not threatened by leaching from structural materials due to gases and chemical components.
- The wells are fully up-to-date licensed. The licensing and construction of bottling plants can commence immediately.
- There is no need to anticipate a long-term decrease in the extractable water volume. The wells’ long-term, flawless operation is guaranteed.